Case studies from all over the country
Do you want to learn more about Daace's case studies? Interested in seeing what we can do for you?
Daace has the experience and expertise to help you achieve success. Contact us today to learn more about our services and how we can help your business succeed.
Case Studies
M5 Junction 9 Tewkesbury
Roadside sheet piling works
Sheet piles for a road widening scheme at Junction 9 of the M5.
See full case studyCrick Road
Shaft sinking works
A 4.5m dia shaft, 7m deep as part of the pumping station for the new housing estate.
See full case studyParkview Hospital
King post & panel retaining solution
A new hospital building being installed next to a roadway, existing and open hospital with two car parks that couldn't be shut proved no problem when paired with our King Post System.
See full case studyLittlecombe Dursley
King post & panel retaining works
Here our King Post System was installed to allow a new housing estate overlooking the rolling hills surrounding the market town of Dursley.
See full case studyChapel Lane Primary - Bingham
Steel Capping Beam Installation
After previously installing sheet piles at Chapel Lane Primary, we were called back to site to install this steel capping beam.
See full case studyChipperfield Road
King post & panel retaining solution
This Birmingham based development consisted of 53 units spread across two adjacent sites.
See full case studyLadywood Road - Four Oaks Estate
Contiguous piled basement
This home extension started below ground with a basement swimming pool.
See full case studySandford Primary School
King post & panel retaining solution
Working under time constraints of the school holidays, Daace's staff managed to get the works design and installed within programme and budget.
See full case studyOld Bridge Inn - Oldbury
King post & panel retaining works
Access constraints don't come much tighter than this new build estate in Oldbury.
See full case studyDudley Looping Pit
Contiguous piled cofferdam for pit installation
Here, Daace used their knowledge of ground retention to form a Contiguous Cofferdam for a pit installation where propping wasn't an option.
See full case studyLoaning Meadows - Berwick-Upon-Tweed
Sheet pile retaining works
Daace has been working on a retail development to provide safe access for future shoppers with this sheet piled solution to terrace the site.
See full case studyDrayton Manor - Tamworth
Sheet piled wall solution
Now hidden behind wooden cladding, our sheet pile wall installation allowed for the build of a new Pony Trek ride at Drayton Manor.
See full case studyBurton Hospital
King pile wall system
Retaining structures of over 5m are possible with our King Pile Wall system.
See full case studyStoneycroft - Bromford
King pile wall system
King pile wall system built into a slope.
See full case study